Pool Construction
Concrete is the traditional material used for building inground swimming pools and at Neptune Swimming Pools we build indoor and outdoor swimming pools using traditional materials and methods.
Reinforced, Concrete, Tiled Pool
Our top of the range fully reinforced concrete, tiled swimming pool takes approximately 8 weeks from start to completion depending on finishes and pool surround.
This method uses a shuttering block with reinforced vibrated concrete within the cavity of the shuttering block. The pool shell carries a 15 year guarantee.
Liner Pool
Our concrete block & liner Swimming pool which can be built complete with inbuilt corner steps or roman end allowing the liner to fit snugly over interior pool shell and steps, is constructed using 100mm dense concrete blocks laid flat to produce a solid 225mm wall with a reinforced ring beam around the top of the pool.
All pools are built to SPATA standards.
Neptune Swimming Pools designs and builds swimming pools throughout Suffolk, Essex and Cambridgeshire.
|
|
Latest News :
 |
|
| |
Spring is almost here and it's time to think about opening your pool. [ 24-02-2010 ] |
 |
|
| |
Neptune Swimming Pools are pleased to announce that once again, following their rigorous inspection by the Swimming Pool & Allied Trades Association (SPATA), the company has received recognition and full SPATA membership approval. [ 15-09-2009 ] |
 |
|
| |
Practical & Affordable The Neptune Liner Pool is Second to None. [ 17-02-2009 ] |
Useful Information :
|
|
 |